Williams Steel Erection Co., Inc. is assembling and erecting 32 pedestrian bridges for Phase 2 of the Dulles Corridor Metrorail Silver Line Extension project. The bridges will connect the 5 at-grade stations in the median of the Dulles Toll Road and Dulles Greenway to the wayside parking areas. Below are pictures from August 21st and 23rd setting 2 spans at the new Herndon Station. Check back soon for more updates on this project.