Pedestrian Bridge Erection for Silver Line Extension

Williams Steel Erection Co., Inc. is assembling and erecting 32 pedestrian bridges for Phase 2 of the Dulles Corridor Metrorail Silver Line Extension project.  The bridges will connect the 5 at-grade stations in the median of the Dulles Toll Road and Dulles  Greenway to the wayside parking areas.  Below are pictures from August 21st and 23rd setting 2 spans at the new Herndon Station.  Check back soon for more updates on this project.